| Project | Foundations for Berth 8 & 9 |
| Client | Martrade Group |
| Location | Khor Al Zubair Port, Basra/Iraq |
| Date | 2016 |
| Description | Removing the concrete parts then cleaning the area and cut the concrete for the sides then put 2 layers of steel mesh 8mm thickness with casting concrete C30, 25 cm thickness with polythene with removing the concrete pieces as the condition. |